Project Name: Waneng Maanshan Power Plant Units #1 & #2 Boiler Lighting Energy-Saving Retrofit Project
Installed Capacity: 2 × 660MW units
Main Lighting Products Supplied: ZY9145 LED Flood Lights, over 1,200 sets supplied.
Delivery Date: February 2018